What changed
Ministerial Direction P5.7 Flooding took effect on 1 July 2026 and replaced the former Direction 4.1. It applies to planning proposals lodged on or after that date, which means rezonings and other changes to a local environmental plan. It does not apply to development applications. Those are still assessed against the flood clauses of the local environmental plan and the council's development control plan.
The rezoning test
Under the direction's second principle, a planning proposal must not rezone land within the flood planning area from a recreation, rural, special purpose or conservation zone to a residential, employment, mixed use, working waterfront or special purpose zone. The flood planning area is the land at or below the flood planning level, which is typically the defined flood event plus a freeboard.
A proposal caught by the test can proceed only if the inconsistency is justified, or if the zone boundary is redrawn to keep the more intensive zone out of the flood planning area. The ground most often relied on is a supporting study, usually a flood impact and risk assessment, that shows how the proposal meets the direction's aim.
Beyond the flood planning area
The direction is triggered by flood prone land, which reaches the full extent of flood risk, up to the probable maximum flood. On all flood prone land, a planning proposal must not permit seniors housing, residential care, child care, hospitals and similar uses where occupants cannot effectively evacuate, and it must not significantly increase demand on emergency services. Councils are increasingly asking for a flood assessment where residential land sits above the flood planning level but within the probable maximum flood.
What comes next
The NSW Government has finalised the State Environmental Planning Policy (Climate Change and Natural Hazards) 2026. Its urban heat and climate change considerations commence on 1 October 2027.
What this means for landowners: our view
- Rural land that lies mostly inside the flood planning area is unlikely to be rezoned for housing or employment, and what a developer can pay for it reflects that.
- Land above the flood planning area can still be rezoned, but a flood assessment to the probable maximum flood is now part of the case, and so is evacuation.
- Where only part of a holding is affected, the zone boundary can sometimes be drawn to keep new development out of the flood planning area, with that part left rural.
- A flood study prepared early answers these questions before anyone commits, and it is worth having before a sale or an option is discussed.
How we approach it
We study each site's flood questions before we make an offer, including where the flood planning area and the probable maximum flood fall on the land. If you are thinking about an approach, we are happy to explain what we would look at.
Sources
- Floodworks, "Ministerial Direction P5.7 — Flooding", stakeholder primer (current as at October 2026)
- NSW Planning, "Natural hazards" (read 13 November 2026)
- NSW Department of Planning, Housing and Infrastructure, "Considering flooding in land use planning" guideline (July 2026)
This note is general information as at 13 November 2026. It is not advice, and it does not describe any particular site. Please get advice on your own land.